PRIORITY SEGMENTS & CURVES

BARRIER-CANDIDATE SEGMENTS · HORIZONTAL CURVE VS TANGENT SECTIONS · AS-BUILT RADII (REFERENCE)
Loading…

Corridor map

Priority segments are the barrier candidates: unprotected crashes only (not contained by existing barrier). The design centerline is split into curve (violet) and tangent (teal) sections; segments are highlighted by section and sized by EPDO. Radii are as-built values, shown for reference.

Corridor
Highlight cutoff
Move the cursor over the corridor to trace the stationing.
Click a curve, tangent, or priority segment for details.

Layers

Priority segments

Each barrier-candidate segment with its section and, on curves, the as-built radius. Sort any column; filter by section.

Show:
Station Side Crashes EPDO Section Non-dry % As-built radius (ft) Lean

Curves with recurring dry-pavement crashes

Horizontal curves with a repeat crash pattern that is mostly on dry pavement, where friction is unlikely to be the cause, whether or not barrier is present. As-built radius is shown for reference; tighter radii are the stronger candidates. Threshold: at least 3 crashes and over half on dry pavement.

Curve (station) As-built radius (ft) Crashes Dry % With barrier